Foto Galeria
  • Field work
  • Events
  • Images from KESCO
Regular activities of maintenance during January 2015_2
Regular activities of maintenance during January 2015_1
During the installation of pole mounted transformer Sports Gym _Obiliq
Installation of metallic – armored construction in substation Udhekryqi in Fushe-Kosove
Installation of cable heads in cubicles of medium voltage in substation Udhekryqi_ Fushe-Kosove
Medium and low voltage network installed in new carrying concrete pole in street Rezmi Azemi _Prizren
Neighborhood Dardania 8_air network situation 0.4 kV after installation of cable and after installation in concrete pole
Network 10kV before and after installation of new metallic construction in Pogragje_Gjilan
Network situation after dislocation of substation in new metallic construction
Substation situation before and after replacement of low voltage cabinet in Bardhosh _Prishtine
Line disconnector installed in overhead line LP 10 kV Malisheva_Gjilan
Situation of 10 kV network before and after installation of new wooden pole in overhead line LP 10 kV Hogoshti _branching Karanidell _Kamenice
Installation of new pole in Budrike, overhead line LP Kllokot_Skifteraj
Installation of fuses and dischargers in TS Brod, Gjonaj_ Ferizaj
Repair of cabinet in village Telaqet in Mitrovice
Preparation of cable heads _Gjakove
Cleaning of track in overhead line LP Mramor_Slivove
Installation of network in new poles of construction in new overhead line 10 kV
Regulation of second phase cut _LP 35 kV Koliq_Batllave
Transfer of transformer from wooden pole in metallic construction
Transfer of overhead line to underground LP Gjakova 3
Installation of new pole in overhead line LP Mramor_Slivove
During works in TSSH Guska 1_Gjakove
Measurement of the working earth on the Livoci feeder
Placement of metallic construction pole for installation of substation
Placement of pipes for concrete poles
Placing and direction of concrete transmission pole in 10 kV network
Repair of cabinet 0.4 kV in substation
Installation of transformer from TS wooden portal poles in TS pole of metallic construction
Installation of cabinet 0.4 kV in substation
Installation of insulators VHD 20 kV in metallic console
Installation of fuses bases 0.4 kV
Transfer of 10 kV and 0.4 kV network from damaged wooden pole in new concrete pole
Direction of angle concrete pole
Dismantling of wooden pole type pyramid
Dismantling of 10 kV network from damaged wooden pole
Installation of Low Voltage Network in concrete pole
Dismantling of 10 kV network from damaged wooden pole
Dismantling of 10 kV network from substation from wooden poles of type portal
Finalization of Gadime Overhead line_2
New warehouse in Mitrovica
The students of KEDS Academy start the work
Work on the field
KEDS with new cherry pickers _2
KEDS with new cherry pickers_1
Investments on the overhead line_Peje
Susret u opštini _ Klina
Meeting with the municipalities _ Peje
Meeting with the municipalities _Suhareke
Meeting with the municipalities _ Prizren
Meeting with the municipalities _ Podujeve
Meeting with the municipalities _ Prishtine with Directorate of Infrastructure
Finalization of Gadime Overhead line_3
Finalization of Gadime Overhead line_1
KEDS cleans more than 600 kilometers of network in whole Kosovo_1
KEDS cleans more than 600 kilometers of network in whole Kosovo_2
KEDS cleans more than 600 kilometers of network in whole Kosovo_3
New Overhead Line in Fusha e Pejes_3
New Overhead Line in Fusha e Pejes_2
New Overhead Line in Fusha e Pejes_1
At work_15
At work_14
At work_13
At work_12
At work_11
At work_10
At work_9
At work_8
At work_7
At work_6
At work_5
At work_4
At work_3
At work_2
At work_1
Hand Held Unit meter reading_1
Hand Held Unit meter reading_2
The regular maintenance activities of substations 10/0.4kV_3
The regular maintenance activities of substations 10/0.4kV_2
The regular maintenance activities of substations 10/0.4kV_1
Maintenance work in the District of Prizreni _ replacement of electricity pole _3
Maintenance work in the District of Prizreni _ replacement of electricity pole _2
Maintenance work in the District of Prizreni _ replacement of electricity pole _1
New line for QKUK _2
New line for QKUK _1
New line for QKUK _3
Releasing in operation the substation SS 10(20)/0.4 kV Kodra e Trimave 7_Pristina_3
Releasing in operation the substation SS 10(20)/0.4 kV Kodra e Trimave 7_Pristina_1
Releasing in operation the substation SS 10(20)/0.4 kV Kodra e Trimave 7_Pristina_2
Veternik_connection of two feeders in SS Prishtina 7_5
Veternik_connection of two feeders in SS Prishtina 7_4
Veternik_connection of two feeders in SS Prishtina 7_3
Veternik_connection of two feeders in SS Prishtina 7_2
Veternik_connection of two feeders in SS Prishtina 7_1
Installing the meters in electricity poles _ village Bojan – Ferizaj _4
Installing the meters in electricity poles _ village Bojan – Ferizaj _3
Installing the meters in electricity poles _ village Bojan – Ferizaj _2
Installing the meters in electricity poles _ village Bojan – Ferizaj_1
Xerxe_ Installation of meter boxes in poles_3
Xerxe_ Installation of meter boxes in poles_2
Prizren_ replacement from 630 kVA to 1000kVA_1
Xerxe_ Installation of meter boxes in poles_1
The repair of 10 kV cable in Pristine_1
The repair of 10 kV cable in Pristine_3
Sub districts Podujeva – Replacement of TS Hertice (increase of capacity 630 – 1000 kVA)_3
Sub districts Podujeva – Replacement of TS Hertice (increase of capacity 630 – 1000 kVA)_2
Sub districts Podujeva – Replacement of TS Hertice (increase of capacity 630 – 1000 kVA)_1
Sub district Rahovec – replacement from 630 kVA to 1000kVA_3
Sub district Rahovec – replacement from 630 kVA to 1000kVA_2
Sub district Rahovec – replacement from 630 kVA to 1000kVA_1
Repair of substation – adding oil
Reconstruction of low voltage network
District of Gjakova : erecting – dismantling the pole
District of Gjakova: Removal of substation TS 630kVA and its replacement with substation of capacity 1000kVA_3
District of Gjakova: Removal of substation TS 630kVA and its replacement with substation of capacity 1000kVA_2
District of Gjakova: Removal of substation TS 630kVA and its replacement with substation of capacity 1000kVA_1
Reinforcement of conductor
Realization of project for replacement of transformers
Relocation of meters
Replacement of Poles
Meter Replacement
Installing the meters
Removal-Erection of Pole_Gjilan
Replacement of poles_Malisheve
Replacement of poles _Dragash
Network condition prior and after replacement of poles
Replacing the power transformer from 630 kVA to 1000 kVA_Prishtine
Stevie Awards Ceremony_8
Stevie Awards Ceremony_10
Stevie Awards Ceremony_9
Stevie Awards Ceremony_6
Stevie Awards Ceremony_5
Stevie Awards Ceremony_4
Stevie Awards Ceremony_3
Stevie Awards Ceremony_2
Stevie Awards Ceremony_1
Visit to one of the electro-technical laboratories at University of Bogazici
Visit throughout the company, recognizing the work processes and system quality management
Visit to the customer service company
Visit to the University of Bogazici
The Staff of KEDS Academy received presents by the General Director of Calik Yedas Company
Prof. Ruhi Kaykayoglu while holding lectures to the group of KEDS Academy at University Bogazici
Welcomed by Mr. Mesut Serhat Dinc, Deputy General Director at LIMAK ENERGY, leader of the program of KEDS Academy
Presentation by the Director of Operations in Yedas, use of new technologies and work process improvements from the time of privatization
Presentation of the importance of KEDS Academy Program by General Director Mr. Nuretin Turkoglu
Presentation at the Calik Yedas company, systems used, achievements and targets of the company (SAP)
Investment in development of the new generations-one of the priorities of Calik Yedas company
With Mr. Nuretin Turkoglu, General Director of Calik Yedas, in Samsun
Visiting the electrical equipments in Bursa
General Director of Calik Yedas, introduces the standards applied by this company (Certification by EFQM)
Visit to the museum Kemail Ataturkut
KEDS Academy wins four most prestigious international prices_2
KEDS Academy wins four most prestigious international prices_1
Graduation of first generation in KEDS Academy_12
Graduation of first generation in KEDS Academy_11
Graduation of first generation in KEDS Academy_10
Graduation of first generation in KEDS Academy_9
Graduation of first generation in KEDS Academy_8
Graduation of first generation in KEDS Academy_7
Graduation of first generation in KEDS Academy_6
Graduation of first generation in KEDS Academy_5
Graduation of first generation in KEDS Academy_4
Graduation of first generation in KEDS Academy_3
Graduation of first generation in KEDS Academy_2
Graduation of first generation in KEDS Academy_1
Meeting of the Turkish national team main coach, Mr. Fatih Terim, with students KEDS Academy_1
Friendly football match between Kosovo and Turkey_10
Friendly football match between Kosovo and Turkey_9
Friendly football match between Kosovo and Turkey_8
Friendly football match between Kosovo and Turkey_7
Meeting of the Turkish national team main coach, Mr. Fatih Terim, with Mr. Mesut Serhat Dinc
Friendly football match between Kosovo and Turkey_6
Friendly football match between Kosovo and Turkey_5
Friendly football match between Kosovo and Turkey_4
Friendly football match between Kosovo and Turkey_3
Friendly football match between Kosovo and Turkey_2
Friendly football match between Kosovo and Turkey_1
KEDS participates in energy forum in Tirana_3
KEDS participates in energy forum in Tirana_2
KEDS participates in energy forum in Tirana_1
KEDS increased cooperation with municipalities_3
KEDS increased cooperation with municipalities_2
KEDS increased cooperation with municipalities_1
KEDS – Post of Kosovo signed agreement for the possibility of payment of electricity in Post offices_3
KEDS – Post of Kosovo signed agreement for the possibility of payment of electricity in Post offices_2
KEDS – Post of Kosovo signed agreement for the possibility of payment of electricity in Post offices_1
KEDS Academy takes of officially_3
KEDS Academy takes of officially_2
KEDS Academy takes of officially_1
KEDS equipped with new vehicles_3
KEDS equipped with new vehicles_2
KEDS equipped with new vehicles_1
KEDS bought over 1,000 bags for woman of Roma, Ashkali and Egyptian community_3
KEDS employees answer the call for blood donation_6
KEDS employees answer the call for blood donation_5
KEDS employees answer the call for blood donation_4
KEDS employees answer the call for blood donation_3
KEDS employees answer the call for blood donation_2
KEDS employees answer the call for blood donation_1
KEDS bought over 1,000 bags for woman of Roma, Ashkali and Egyptian community_4
KEDS bought over 1,000 bags for woman of Roma, Ashkali and Egyptian community_2
KEDS bought over 1,000 bags for woman of Roma, Ashkali and Egyptian community_1
From a football match
Football Tournament in KEDS
KEDS made happy the kids in Krusha_1
KEDS made happy the kids in Krusha _2
KEDS made happy the kids in Krusha _3
KEDS made happy the kids in Krusha _4
KEDS made happy the kids in Krusha _5
KEDS made happy the kids in Krusha _6
KEDS made happy the kids in Krusha_7
KEDS made happy the kids in Krusha _8
Keds Call Center
Online Services
Residential and Business Services

Find services for residential and commercial customers

Bill & Payment

Find information for explanation of bill and the methods of payments

Open positions

Find information for job vacancies

Kompania Kosovare për Furnizim me Energji Elektrike SH.A
Kosovo Electricity Supply Company J.S.C
Kosovsko Preduzece za Snabdevanje Elektricnom Energijom D.D
Qendra e thirrjeve:
0800 791 00